• Conducted detailed site surveys and feasibility assessments for solar project planning.
  • Checked energy production forecasts using HelioScope and analyzed ROI and payback periods.
  • Modeled 3D layouts of solar installations using SketchUp.
  • Ensured compliance with solar installation safety protocols.
  • Recommended system types (ongrid, offgrid, hybrid) based on geographic and climatic analysis.
  • Understood solar inverter operating principles and selected suitable units based on site requirements.
  • Supported solar installation and commissioning activities on-site.

Internee Electrical Engineer

Pakistan Petroleum Limited (PPL), Sui – Jul 2012 to Aug 2012

  • Gained hands-on exposure to field electrical systems and maintenance routines.

EDUCATION

  • MBA Executive – Virtual University, Lahore (2018–2020)
  • B.Sc. Electrical Engineering – UET Lahore (2010–2014)
  • F.Sc. Pre-Engineering – BISE D.G. Khan (2007–2009)
  • Matric (Science) – BISE D.G. Khan (2005–2007)

CORE SKILLS

  • Electrical System Maintenance & Troubleshooting
  • Solar Installation Safety & Best Practices
  • PV Solar Design (HelioScope, SketchUp)
  • Site Surveys & Feasibility Studies
  • Ongrid, Offgrid & Hybrid Solar Systems
  • Project Planning & Scheduling (Primavera P6)
  • Work Breakdown Structure (WBS) Development
  • AC/DC Motors, LV Transformers, UPS Systems
  • MCC & Switchgear Maintenance
  • MS Office
  • AutoCAD, SketchUp, Proteus
  • Load Estimation & ROI Analysis
  • Gantt Chart & Baseline Preparation

PROJECTS & RESPONSIBILITIES

  • Carried out maintenance of air conditioners and transformer systems.
  • Hands-on experience with circuit breakers, cable installation, and troubleshooting.
  • Proficient in the use of essential electrical testing instruments including Megger, Earth Tester, Digital Multimeter, Clamp Meter, and Vibrometer for accurate diagnostics and preventive maintenance.
  • Prepared technical documentation and performed routine inspections.
  • Led multiple solar PV projects from design to execution.
  • Performed routine inspection, troubleshooting, and fault resolution of induction motors.
  • Conducted earthing tests and ensured grounding systems were installed and maintained in accordance with safety standards.
  • Developed detailed project schedules using Primavera P6, including Work Breakdown Structures (WBS), activity sequencing, and duration estimation.
  • Created Gantt charts, set project baselines, and tracked progress to monitor project performance.
  • Allocated resources and updated timelines to reflect actual progress, supporting accurate project forecasting.