Des. #2003023 Delaware Co. |
Bridge Replacement TPC res 21-13 |
BR#112, CR 600S over Williams Creek, 0.60 miles west of CR 300W. AQC exempt 8/10/2021 |
PE " |
180,000 45,000 |
BRZ CBR |
2022 2022 |
$ 1,700,000 PE: 225,000 RW: 20,000 CN: 1,455,000 |
|
Des. #2100143 Delaware Co. |
BRIDGE RE- INSPECTION TPC res 21-13 |
Delaware County Re-inspection Study & Report. AQC exempt 8/10/2021 |
PE " |
240,000 60,000 |
BRZ CBR |
2022 2022 |
$ 300,000 |
Note: PE is Preliminary Engineering, RW is right-of-way acquisition, CN is construction, and C.E. is construction engineering. “Prev” is pre-FY 2020 figures from the previous DMTIP.
INDOT PROJECT SHEET - ROAD AND OTHER PROJECTS
MOST COMMONLY USED FUND CODES
INSTIP WORK PROGRAM FY 2020-23
906> State Funds, STP> Surface Transpo. Program (Federal),
| DES. NO. | PROGRAM | DESCRIPTION | PHASE | COST | FUND CODE | Fiscal Year | Est. Cost to Complete/Total |
|---|---|---|---|---|---|---|---|
| 1298228 INDOT |
Intersection Improvement | Added turn lanes for SR 332 at CR 600W. | PE | 196,320 | STP | Prev |
$ 1,655,497 PE: 245,400 RW: 10,000 CN: 1,400,097 |
| " | 49,080 | 906 | Prev | ||||
| RW | 8,000 | STP | Prev | ||||
| " | 2,000 | 906 | Prev | ||||
| Constr. | 1,120,078 | STP | 2021 | ||||
| " | 280,019 | 906 | 2021 | ||||
| 1400043 INDOT |
Bridge Program | US 35/SR 28, 3.85 miles east of I-69: bridge deck replacement (E of 525W). | PE | 110,680 | NHS | Prev |
$ 684,251 PE: 138,350 RW: 20,000 CN: 766,678 |
| " | 27,670 | 906 | Prev | ||||
| RW | 16,000 | NHS | Prev. | ||||
| " | 4,000 | 906 | Prev. | ||||
| CN | 613,342 | NHS | 2021 | ||||
| " | 153,336 | 906 | 2021 | ||||
| 1500037 INDOT |
Pavement Replacement | US 35 CRC pavement at the Muncie Bypass, 1.053 miles. 2020 construction | PE | 141,200 | STP | Prev. |
$ 1,745,081 PE: 176,500 CN: 1,568,581 |
| " | 35,300 | 906 | Prev. | ||||
| CN | 1,254,865 | STP | 2020 | ||||
| " | 313,716 | 906 | 2020 | ||||
| 1593191 INDOT |
Preventative Maintenance | SR 167 HMA Overlay Paving from SR 67 to 4.24 miles N of SR 67. | PE | 128,000 | STP | Prev |
$ 2,795,844 PE: 160,000 CN: 2,635,844 |
| “ | 32,000 | State | Prev | ||||
| CN | 2,108,675 | STP | 2020 | ||||
| “ | 527,169 | State | 2020 | ||||
| 1593199 INDOT |
Preventative Maintenance | SR 32 HMA Overlay: from SR 9 to US 35, 15.1 miles. | PE | 200,000 | STP | Prev. |
$ 10,879,773 PE: 250,000 CN:10,629,773 |
| " | 50,000 | State | Prev. | ||||
| CN-br | 198,238 | STP | 2020 | ||||
| CN-rd | 8,305,581 | STP | 2020 | ||||
| CN | 2,125,954 | State | 2020 | ||||
| 1600783 INDOT |
Preventative Maintenance | SR 28 from SR 67 to 0.79 miles east of SR 67: reconstruction. | PE-br | 560,000 | STP | 2020 |
$ 18,101,003 PE-br: 700,000 PE-rd: 800,000 RW-br: 30,000 RW-rd:350,000 CN: 16,221,003 |
| PE-rd | 640,000 | STP | 2020 | ||||
| PE | 300,000 | State | 2020 | ||||
| RW-br | 24,000 | STP | 2021 | ||||
| RW-rd | 280,000 | STP | 2021 | ||||
| RW | 76,000 | State | 2021 | ||||
| CN | 12,976,802 | STP | 2022 | ||||
| CN | 3,244,201 | State | 2022 | ||||
| 1600792 INDOT |
Preventative Maintenance | SR 28 HMA Overlay: from SR 3 to SR 67, 2.71 miles. | CN | 1,639,309 | STP | 2021 |
$ 2,049,136 CN: 2,049,136 |
| " | 409,827 | State | 2021 | ||||
| A:1601927 B:1601944 INDOT B-40508 |
Bridge Program | SR 332 over Pleasant Run Creek, 1.39 miles E of I-69: pipe lining bridge rehabilitation. | PE | 40,000 | STP | 2020 |
$ 507,930 PE: 50,000 RW: 20,000 A CN: 295,883 B CN: 142,047 |
| " | 10,000 | State | 2020 | ||||
| RW | 16,000 | STP | 2021 | ||||
| " | 4,000 | State | 2021 | ||||
| CN | 350,344 | STP | 2022 | ||||
| " | 87,586 | State | 2022 |