fenced boundary prior to construction shall be furnished to the DMMPC Executive Director, and any other person designated and authorized by the County Commissioners. It shall be the responsibility of the applicant, owner and/or operator to obtain any variance required by such change and to comply with any other requirement necessitated by such change. Any variance required by this Section shall be obtained prior to construction or implementation of such change.

2. Damages to waterways

Damages to drainage ditches, field tiles, or other drainage related infrastructure and their connections caused by the construction, installation, or maintenance of a solar facility system must be completely repaired by the project owner or remedied with the installation of new drainage infrastructure so as to not impede the natural flow of water. All repairs must be completed within a reasonable period of time and:

3. Sub-surface and surface drains (regulated and non-regulated).