owner/operator's sole expense. The inspector will ensure that all drainage infrastructure was installed according to specifications of the drainage plans and according to the requirements in the Stormwater Management Ordinance and Stormwater Quality Management Plan. any additional.

4.  Groundwater Monitoring

Prior to construction, the owner/operator shall engage at the owner/operators' expense an independent third party to develop a groundwater monitoring program within the fence line of the solar facility which will include, but not be limited to, the establishment of baseline levels of ground water quality and for monitoring to continue annually for the life of the project, with the final monitoring taking place within six (6) months after the completion of decommissioning. The results of the monitoring program are to be submitted to the DMMPC Executive Director within thirty (30) days of the owner/operator receiving the results from each monitoring every two years or in event of breakage of panels through storms or accidents or at the request of the DMMPC Executive Director. Results shall also be provided to any necessary government agencies as required by law.

5.  Construction Requirements

6.  Post-Construction Requirement for a solar facility

Post-construction, the applicant shall comply with the following provisions: