HANDWASHING/TOILET FACILITIES

51. Handwashing sinks are required in each food preparation and dishwashing area. (sect. 356)

How many hand sinks will be provided?

52. Are all toilet room doors self-closing where applicable? (sect. 420) Yes No

53. Are all toilet rooms equipped with adequate ventilation? (sect. 437) Yes No

ROOM FINISH SCHEDULE (what the interior of the facility will look like.)

54. Please indicate which materials (i.e. quarry tile, Stainless Steel=SS, plastic cove molding, etc.) will be used in the following areas. (sect. 410)

(QT = Quarry Tile, SS = Stainless Steel, PCM = Plastic Cove Molding)

Area Floor Coving Wall Ceiling
Bar
Consumer Self
Service
Dishwashing
Food Storage
Garbage Storage
Kitchen
Mop/Service Sink
Other Storage
Serving Line
Toilet Rooms
Other:
Other:
DCHD Plan Review Packet 2026 Page 16 of 21