Contents and Specifications for Facility and Operating Plans as required in Section 110 of 410 IAC 7-26:
(Please check items submitted for review)
- Proposed menu (including seasonal, off-site and banquet menus).
- Anticipated volume of food to be stored, prepared, and sold or served.
- Proposed layout, mechanical schematics, construction materials, and finish schedules.
- Proposed equipment types, manufacturers, model numbers, locations, dimensions, performance capacities, and installation specifications.
- Evidence that standard procedures that ensure compliance with ISDH Rule 410 IAC 7-26 are developed or are being developed.
- Plan review questionnaire completed and submitted to the regulatory authority.
- Please list any other information that may be required by the regulatory authority for the proper review of the proposed construction, conversion or modification, and procedures for operating a retail food establishment in the comment section listed below.
Signature of Applicant:
Print Name of Applicant:
Relationship to Project:
Date Signed:
Note: If all the required information is not submitted to the regulatory authority, it may delay the review process of your plans and possibly delay construction.
OFFICE USE ONLY:
Date Received:
By: