Table 4 below shows a comparison of the water resources needed to meet the City’s demands in 2017 and 2018.
TABLE 4
WATER RESOURCE RECORD
WATER RESOURCE RECORD
| Location | 2017 Gallons | 2017% | 2018 Gallons | 2018% |
|---|---|---|---|---|
| Oakwood WTPs | 371,918,000 | 100.0% | 426,781,000 | 99.58% |
| Dayton/Shroyer | 0 | 0% | 1,797,000 | 0.419% |
| Dayton/Springhouse | 0 | 0% | 19,000 | 0.004% |
| County/Fairmont | 0 | 0% | 0 | 0% |
| TOTALS: | 371,918,000 | 100% | 428,597,000 | 100% |
There was a increase in demand of 56,679,000 gallons of water in 2018 compared to 2017 (15.2%). Table 5 on the next page shows the comparison in total gallons pumped to the system per month for 2017 and 2018.
V.
MAINTENANCE
The following is a summary of the larger maintenance projects that took place in 2018.
January:
Replace vent on water tower
Install electrical grounding on water tower
February:
Replace old lights with LED lighting at 210 Shafor WTP
Rebuild #2 booster pump at water tower booster station
March:
Repair cl2 leak at 120 Springhouse WTP
Rebuild all control valves on four softening units at 210 Shafor WTP
April:
Cleaned both salt bins at 210 Shafor
Replace control relay at Well #6
Replace 120 Springhouse plant controls
May:
Replace PRV at 120 Springhouse
Install new outside doors at 210 Shafor WTP
June:
Fix cl2 leak at 120 Springhouse
Cut brush back on well field road on Firwood
Rebuild backwash valve 210 Shafor WTP
July:
New pump and motor for Well #2
New pump and motor for Well #5
Replace control module on #2 VFD at 120 Springhouse WTP
August:
New bypass meter at 120 Springhouse WTP
Replace cl2 feed line, pump and injector at 210 Shafor WTP
Install 10” EZ valve, 4’ shut off valve and 4” check valve at Well #4
September:
Replace cl2 feed line at 120 Springhouse
October:
Cleaned #2 salt bin at 120 Springhouse WTP
November:
Replaced all electronic switches for the SCADA system
December:
Replaced 9 outside security lights with LEDs at 120 Springhouse
All preventive maintenance was performed on schedule and all day-to-day repairs were performed as needed. All parts inventories are up-to-date in case of emergencies.