This.
Accu flow system, and so they're willing to give it away to a few people. We're kind of ideal because we're in Duchenne county and we're close to the manufacturer's headquarters, and so their engineers can come out and see how the product works. But also, I mean, what a great asset for us, to be able to inject the stabilizer right in the same process. So it's cutting down on loss of the product, but also efficiency, increasing efficiency in the process.
So this is a reality. We don't have the money to replace $2 billion worth of asphalt. And so we're going to have to be creative in some situations. And I think an upgraded zipper is in order to help us do that.
So, Commissioner Killian, do you have any questions?
I.
We didn't get to go in and run.
No, we didn't get to go, but I know that things are better. I made the newer, this stuff they met. They make it better, so they'll be able to be better.
I imagine this zipper is probably twice as fast as ours we used, I would say.
Yeah, well, and that's quite a factor.
Yeah.
We were using the smaller drum, and so I think it'll probably be slightly slower than what they were doing the other day. But, man, they were making tracks.
I was impressed when I went out there because I watched our old zipper, and it's pretty tedious and slow process. I think the remote is a huge advantage.
I think so.
I mean, you've got a guy that's actually out on the ground, can see exactly what's happening. And so it's a two man operation.
But I think some huge advantages over this, over the old zipper.
Our old zipper, you know, if you get over, like, three or four inches yet, put the box on or take it off.
So.
And that's quite a process to just do that. This one don't have a box.