Scroll horizontally to view all years and Total →

ID # Description 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 and
beyond
Total
Water
Water Tower Painting - Exterior - 690,000.00 - - - - - - - - 690,000.00
Water Plant and Water Wells Meter Replacement - - - - - - - - - 40,000.00 40,000.00
Ion Exchange Media Replacement - 120 Springhouse - - - - - - - - - 130,000.00 130,000.00
Over Head Door Replacement - Springhouse - - - - - - - - - 16,800.00 16,800.00
W-14T Trailer for water valve and trench shoring equipment. 6,000.00 - - - - - - - - 6,000.00 12,000.00
Scada Controls - Springhouse - 30,000.00 - - - - - - - - 30,000.00
W-13 Chevy Colorado - - - 45,000.00 - - - - - - 45,000.00
120 Springhouse Water Plant Roof Replacement - - - - - - - - - 20,000.00 20,000.00
Iron and Manganese Plant Filter Rebuild - - - - - - - - - 225,000.00 225,000.00
Lookout Ridge Water Main Loop - - - - - - - - - 200,000.00 200,000.00
Water Tower Repairs and Improvements - 20,000.00 - - - - - - - - 20,000.00
Aberdeen Water Main Improvement - - - - 1,000,000.00 - - - - - 1,000,000.00
Water System Controls Upgrade 210 Shafor water plant. - - - - - - - - - 30,000.00 30,000.00
S-23 Kubota Backhoe/Loader, B7100 (Replaced by W-15) - - 30,000.00 - - - - - - - 30,000.00
W-14 EZ Valve Water Valve Insertion Machine - 60,000.00 - - - - - - - - 60,000.00
Water Line - Filter Building 210 Shafor - - - - - - - - - 15,000.00 15,000.00
W-15 Kubota Mini Excavator, KX41-2 - - - - 30,000.00 - - - - - 30,000.00
210 Shafer Softening Units - 50,000.00 - - - - - - - - 50,000.00
120 Springhouse Water Plant Emergency Generator - - - - - - - 40,000.00 - - 40,000.00
Water Plant and Water Wells Meter Replacement - - - - - - - - - 56,000.00 56,000.00
Water Line Repairs 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 65,000.00 - - 520,000.00
W-12 GMC Colorado - - - - - - - - - 35,000.00 35,000.00
120 Springhouse Softening Units - - - 40,000.00 - - - - - - 40,000.00
Caton/Far Hills Water Main Improvement - - - - - - - - - 215,000.00 215,000.00
Ion Exchange Media Replacement - 210 Shafor - - - - - - - - - 130,000.00 130,000.00
Utility Line Locater - - - - - - - - - 25,000.00 25,000.00
12" PVC STORM FOR WATER PLANT BACKWASH - - - - - - - - - 50,000.00 50,000.00
Water System Controls Upgrade Wells (SCADA) - - 30,000.00 - - - - - - - 30,000.00
AUTOMATIC METER READING SOFTWARE UPGRADE - - - - - - 35,000.00 - - - 35,000.00
Water Meter & AMR Transmitter Replacements - 333,333.00 333,333.00 333,333.00 - - - - - - 999,999.00
Hydrant Turner - - - - - - - 10,000.00 - - 10,000.00
Water Tower Overflow Upgrades - - - - - - - - - 20,000.00 20,000.00
Trench Box Upgrades 25,000.00 - - - - - - - - - 25,000.00
Water Main Repair - Far Hills at Oakwood & Briar Hill - - - - - - - - - 150,000.00 150,000.00
Pneumatic Underground Piercing Tool - - 10,000.00 - - - - - - - 10,000.00
Valve Turner - Hand Held - - - - - - - 12,000.00 - - 12,000.00
EZ Valves 75,000.00 - - - - - - - - - 75,000.00
Underground Electric Service - Well #6 - - - - - - - - - 52,000.00 52,000.00
Hydrant Buddy - - - - - - - 6,000.00 - - 6,000.00
Water Main Valve Nut Repair Tool - - - - - - - - 14,000.00 - 14,000.00
Chain Breaker for Cast Iron Pipe - - - - - - - - 10,000.00 - 10,000.00
Tower / Repeaters AMR System - - 50,000.00 - - - - - - - 50,000.00
Water Sampling Stations - 6 - - - - - - - - 10,000.00 - 10,000.00
Peach Orchard Vault - - - - - - - - - 30,000.00 30,000.00
Harmon / Park Ave 8 " Water Line Engineering Design 40,000.00 150,000.00 - - - - - - - - 190,000.00
Professional Water Tower Evaluation and Engineering Svcs 15,000.00 - - - - - - - - - 15,000.00
Ridgewood Water Main Improvement - Engineering Design 100,000.00 800,000.00 - - - - - - - - 900,000.00
Rehabilitate Well #4 35,000.00 - - - - - - - - - 35,000.00
Replace Transfer Switch Well #4 50,000.00 - - - - - - - - - 50,000.00
Replace Main Transfer Switch - Firwood Wellfield 65,000.00 - - - - - - - - - 65,000.00
Rehabilitate Well #1 35,000.00 - - - - 40,000.00 - - - 45,000.00 120,000.00
Stager - Valve Replacement 40,000.00 - - - - - - - - - 40,000.00
Volusia Area Water Services Line Improvements - - - 200,000.00 - - - - - 200,000.00 400,000.00