TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst RMM Intersection SHROYER & CLARANNA
Agency/Co. CMT Jurisdiction
Date Performed 3/2/2016 Analysis Year 2015
Analysis Time Period PM PEAK
Project Description SHROYER 3-LANES
East/West Street: CLARANNA North/South Street: SHROYER
Intersection Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 14 786 819 14
Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92
Hourly Flow Rate, HFR (veh/h) 15 854 0 0 890 15
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 0 1 0
Configuration L T TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 11 21
Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92
Hourly Flow Rate, HFR (veh/h) 11 0 22 0 0 0
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L LR
v (veh/h) 15 33
C (m) (veh/h) 752 174
v/c 0.02 0.19
95% queue length 0.06 0.68
Control Delay (s/veh) 9.9 30.5
LOS A D
Approach Delay (s/veh) -- -- 30.5
Approach LOS -- -- D