TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst RMM Intersection SHROYER & WILTSHIRE
Agency/Co. CMT Jurisdiction
Date Performed 3/2/2016 Analysis Year 2015
Analysis Time Period AM PEAK
Project Description   SHROYER 3-LANES
East/West Street: WILTSHIRE North/South Street: SHROYER
Intersection Orientation: North-South Study Period (hrs): 0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 0 693 11 1 530 2
Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92
Hourly Flow Rate, HFR (veh/h) 0 753 11 1 576 2
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 1 1 0 1 1 0
Configuration L TR L TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 5 0 10 20 3 11
Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92
Hourly Flow Rate, HFR (veh/h) 5 0 10 21 3 11
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 1 0 0 1 0
Configuration LTR LTR
Delay, Queue Length, and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration L L LTR LTR
v (veh/h) 0 1 35 15
C (m) (veh/h) 996 849 164 251
v/c 0.00 0.00 0.21 0.06
95% queue length 0.00 0.00 0.78 0.19
Control Delay (s/veh) 8.6 9.2 32.8 20.3
LOS A A D C
Approach Delay (s/veh) -- -- 32.8 20.3
Approach LOS -- -- D C