TWO-WAY STOP CONTROL SUMMARY
General Information Site Information
Analyst RMM Intersection SHROYER & GREENMOUNT
Agency/Co. CMT Jurisdiction
Date Performed 3/2/2016 Analysis Year 2015
Analysis Time Period PM PEAK
Project Description   SHROYER 4-LANES
East/West Street:   GREENMOUNT North/South Street:   SHROYER
Intersection Orientation:   North-South Study Period (hrs):   0.25
Vehicle Volumes and Adjustments
Major Street Northbound Southbound
Movement 1 2 3 4 5 6
L T R L T R
Volume (veh/h) 48 567 804 15
Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92
Hourly Flow Rate, HFR (veh/h) 52 616 0 0 873 16
Percent Heavy Vehicles 2 -- -- 2 -- --
Median Type Undivided
RT Channelized 0 0
Lanes 0 2 0 0 2 0
Configuration LT T T TR
Upstream Signal 0 0
Minor Street Eastbound Westbound
Movement 7 8 9 10 11 12
L T R L T R
Volume (veh/h) 6 45
Peak-Hour Factor, PHF 0.92 0.92 0.92 0.92 0.92 0.92
Hourly Flow Rate, HFR (veh/h) 6 0 48 0 0 0
Percent Heavy Vehicles 2 2 2 2 2 2
Percent Grade (%) 0 0
Flared Approach N N
Storage 0 0
RT Channelized 0 0
Lanes 0 0 0 0 0 0
Configuration LR
Delay, Queue Length, and Level of Service
Approach Northbound Southbound Westbound Eastbound
Movement 1 4 7 8 9 10 11 12
Lane Configuration LT LR
v (veh/h) 52 54
C (m) (veh/h) 758 449
v/c 0.07 0.12
95% queue length 0.22 0.41
Control Delay (s/veh) 10.1 14.1
LOS B B
Approach Delay (s/veh) -- -- 14.1
Approach LOS -- -- B