FAR HILLS AVE & SHANTZ AVE

SIGNAL CONCEPT PLAN

Signal concept plan for Far Hills Ave and Shantz Ave showing the aerial intersection plan, roadway geometry, signal equipment, replacement callouts, pavement markings, scale, north arrow, and title block.
Signal concept plan sheet. Scroll horizontally on narrow screens; select the plan to open the full-resolution view.

Work Scope Legend

  • REPLACEMENT A: Full Replacement
  • REPLACEMENT B: Partial Replacement
  • REPLACEMENT C: Detectable Warning Replacement

Project Details

Project ID 460700
Sheet P.0 | Total 0
Location Far Hills Ave (SR 48) & W./E. Shantz Ave
Design Agency CMT (Crawford, Murphy & Tilly, Inc.)
Designer / Reviewer RTM / SAK (01-06-23)
Horizontal Scale 0, 5, 10, 20 Feet

Sheet Metadata

Section: CTY-RTE-SECTION

Model: 460700_CP102 | Paper Size: 17x11 in.

Date / Time: 1/13/2023 2:13:45 PM | User: rmulvaney

I:\OakwoodOH\200460\200460_00_TrafficSignalMP2022\460700\400_Engineering\Signals\Sheets\460700_CP102.dgn