EBL EBR NBL NBT SBT SBR
Lane Group EBL EBR NBL NBT SBT SBR
Minimum Initial (s) 10.0 20.0 20.0 20.0
Minimum Split (s) 33.0 26.0 26.0 26.0
Total Split (s) 33.0 77.0 77.0 77.0
Total Split (%) 30.0% 70.0% 70.0% 70.0%
Maximum Green (s) 27.0 71.0 71.0 71.0
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0
Recall Mode None C-Max C-Max C-Max
Walk Time (s) 7.0 7.0
Flash Dont Walk (s) 20.0 10.0
Pedestrian Calls (#/hr) 9 4
Act Effct Green (s) 13.4 93.4 93.4
Actuated g/C Ratio 0.12 0.85 0.85
v/c Ratio 0.18 0.28 0.46
Control Delay 42.7 3.4 4.1
Queue Delay 0.0 0.0 0.0
Total Delay 42.7 3.4 4.1
LOS D A A
Approach Delay 42.7 3.4 4.1
Approach LOS D A A
Intersection Summary
Area Type: Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 2 (2%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.46
Intersection Signal Delay: 4.5
Intersection LOS: A
Intersection Capacity Utilization 53.4%
ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 6: Far Hills Ave & Harman Ave