EBL arrow EBR arrow NBL arrow NBT arrow SBT arrow SBR arrow
Lane Group EBL EBR NBL NBT SBT SBR
Permitted Phases 4 2
Detector Phase 4 4 2 2 6
Switch Phase
Minimum Initial (s) 10.0 10.0 20.0 20.0 20.0
Minimum Split (s) 33.0 33.0 26.0 26.0 26.0
Total Split (s) 34.0 34.0 76.0 76.0 76.0
Total Split (%) 30.9% 30.9% 69.1% 69.1% 69.1%
Maximum Green (s) 28.0 28.0 70.0 70.0 70.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None C-Max C-Max C-Max
Walk Time (s) 7.0 7.0 7.0
Flash Dont Walk (s) 20.0 20.0 10.0
Pedestrian Calls (#/hr) 5 5 8
Act Effct Green (s) 13.4 13.4 93.4 93.4 93.4
Actuated g/C Ratio 0.12 0.12 0.85 0.85 0.85
v/c Ratio 0.15 0.12 0.08 0.25 0.41
Control Delay 42.0 41.4 3.5 2.4 2.6
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 42.0 41.4 3.5 2.4 2.6
LOS D D A A A
Approach Delay 41.7 2.4 2.6
Approach LOS D A A
Intersection Summary
Area Type: Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 4 (4%), Referenced to phase 2:NBTL and 6:SBT, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 3.5 Intersection LOS: A
Intersection Capacity Utilization 48.9% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 5: Far Hills Ave & Park Ave