Lanes, Volumes, Timings

01/07/2023
26: Far Hills Ave & Peach Orchard Rd/Peach Orchard Ave
EBL arrow EBT arrow EBR arrow EBR2 arrow WBL2 arrow WBL arrow WBT arrow WBR arrow NBL arrow NBT arrow NBR arrow SBL2 arrow
Lane Group EBL EBT EBR EBR2 WBL2 WBL WBT WBR NBL NBT NBR SBL2
Permitted Phases 4 8 8 2 6
Detector Phase 4 4 8 8 8 2 2 6
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 10.0 10.0 20.0 20.0 20.0
Minimum Split (s) 33.0 33.0 22.5 22.5 22.5 26.0 26.0 26.0
Total Split (s) 36.0 36.0 36.0 36.0 36.0 44.0 44.0 74.0
Total Split (%) 32.7% 32.7% 32.7% 32.7% 32.7% 40.0% 40.0% 67.3%
Maximum Green (s) 30.0 30.0 30.0 30.0 30.0 38.0 38.0 68.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0
Lead/Lag Lead Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None C-Max C-Max C-Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 20.0 20.0 10.0 10.0 10.0
Pedestrian Calls (#/hr) 25 25 20 20 0
Act Effct Green (s) 20.2 20.2 51.0 51.0 82.2
Actuated g/C Ratio 0.18 0.18 0.46 0.46 0.75
v/c Ratio 0.36 0.13 0.02 0.41 0.02
Control Delay 40.6 34.8 14.2 16.4 13.0
Queue Delay 0.0 0.0 0.0 0.0 0.0
Total Delay 40.6 34.8 14.2 16.4 13.0
LOS D C B B B
Approach Delay 40.6 34.8 16.3
Approach LOS D C B
Intersection Summary
Area Type: Other
Cycle Length: 110
Actuated Cycle Length: 110
Offset: 102 (93%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 85
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 19.0 Intersection LOS: B
Intersection Capacity Utilization 57.6% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 26: Far Hills Ave & Peach Orchard Rd/Peach Orchard Ave
Splits and phases phase diagram part 1 Splits and phases phase diagram part 2 Splits and phases phase diagram part 3 Splits and phases phase diagram part 4
Far Hills Ave PM Without 5 Points
CMT