Lanes, Volumes, Timings
26: Far Hills Ave & Peach Orchard Rd/Peach Orchard Ave
01/07/2023
| Lane Group | EBL | EBT | EBR | EBR2 | WBL2 | WBL | WBT | WBR | NBL | NBT | SBL2 | SBL |
| Permitted Phases | 4 | 8 | 8 | 2 | 6 | 6 | ||||||
| Detector Phase | 4 | 4 | 8 | 8 | 8 | 2 | 2 | 6 | 6 | |||
| Switch Phase | ||||||||||||
| Minimum Initial (s) | 10.0 | 10.0 | 10.0 | 10.0 | 10.0 | 20.0 | 20.0 | 20.0 | 20.0 | |||
| Minimum Split (s) | 33.0 | 33.0 | 22.5 | 22.5 | 22.5 | 26.0 | 26.0 | 26.0 | 26.0 | |||
| Total Split (s) | 33.0 | 33.0 | 33.0 | 33.0 | 33.0 | 51.0 | 51.0 | 77.0 | 77.0 | |||
| Total Split (%) | 30.0% | 30.0% | 30.0% | 30.0% | 30.0% | 46.4% | 46.4% | 70.0% | 70.0% | |||
| Maximum Green (s) | 27.0 | 27.0 | 27.0 | 27.0 | 27.0 | 45.0 | 45.0 | 71.0 | 71.0 | |||
| Yellow Time (s) | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 | 4.0 | |||
| All-Red Time (s) | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | 2.0 | |||
| Lost Time Adjust (s) | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||||||
| Total Lost Time (s) | 6.0 | 6.0 | 6.0 | 6.0 | 6.0 | |||||||
| Lead/Lag | Lead | Lead | ||||||||||
| Lead-Lag Optimize? | Yes | Yes | ||||||||||
| Vehicle Extension (s) | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | 3.0 | |||
| Recall Mode | None | None | None | None | None | C-Max | C-Max | C-Max | C-Max | |||
| Walk Time (s) | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | 7.0 | ||||||
| Flash Dont Walk (s) | 20.0 | 20.0 | 10.0 | 10.0 | 10.0 | 10.0 | ||||||
| Pedestrian Calls (#/hr) | 12 | 12 | 18 | 18 | 8 | 8 | ||||||
| Act Effct Green (s) | 14.5 | 14.5 | 60.7 | 60.7 | 87.9 | |||||||
| Actuated g/C Ratio | 0.13 | 0.13 | 0.55 | 0.55 | 0.80 | |||||||
| v/c Ratio | 0.45 | 0.15 | 0.05 | 0.51 | 0.01 | |||||||
| Control Delay | 50.1 | 40.8 | 5.3 | 8.1 | 8.2 | |||||||
| Queue Delay | 0.0 | 0.0 | 0.0 | 0.0 | 0.0 | |||||||
| Total Delay | 50.1 | 40.8 | 5.3 | 8.1 | 8.2 | |||||||
| LOS | D | D | A | A | A | |||||||
| Approach Delay | 50.1 | 40.8 | 8.0 | |||||||||
| Approach LOS | D | D | A |
Intersection Summary
| Area Type: Other | |
| Cycle Length: 110 | |
| Actuated Cycle Length: 110 | |
| Offset: 6 (5%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow | |
| Natural Cycle: 85 | |
| Control Type: Actuated-Coordinated | |
| Maximum v/c Ratio: 0.51 | |
| Intersection Signal Delay: 10.6 | Intersection LOS: B |
| Intersection Capacity Utilization 64.9% | ICU Level of Service C |
| Analysis Period (min) 15 |
Splits and Phases: 26: Far Hills Ave & Peach Orchard Rd/Peach Orchard Ave