HCM 2010 Roundabout

13: W Thruston/E Thruston & SR 48

01/11/2023
Intersection
Intersection Delay, s/veh 8.8
Intersection LOS A
Approach EB WB NB SB
Entry Lanes 2 2 1 1
Conflicting Circle Lanes 2 2 2 2
Adj Approach Flow, veh/h 549 1211 36 25
Demand Flow Rate, veh/h 576 1223 36 25
Vehicles Circulating, veh/h 0 31 562 1216
Vehicles Exiting, veh/h 1241 567 14 38
Follow-Up Headway, s 3.186 3.186 3.186 3.186
Ped Vol Crossing Leg, #/h 18 1 0 57
Ped Cap Adj 0.979 0.999 1.000 1.000
Approach Delay, s/veh 5.9 10.2 5.2 8.1
Approach LOS A B A A
Lane Left Right Left Right Left Left
Designated Moves LT TR LT TR LTR R
Assumed Moves LT TR LT TR LTR R
RT Channelized
Lane Util 0.470 0.530 0.470 0.530 1.000 1.000
Critical Headway, s 4.293 4.113 4.293 4.113 4.113 4.113
Entry Flow, veh/h 271 305 575 648 36 25
Cap Entry Lane, veh/h 1130 1130 1104 1106 762 482
Entry HV Adj Factor 0.952 0.954 0.990 0.990 1.000 1.000
Flow Entry, veh/h 258 291 569 642 36 25
Cap Entry, veh/h 1053 1055 1092 1094 762 482
V/C Ratio 0.245 0.276 0.521 0.587 0.047 0.052
Control Delay, s/veh 5.7 6.1 9.4 10.8 5.2 8.1
LOS A A A B A A
95th %tile Queue, veh 1 1 3 4 0 0