While prioritizing pedestrian movement, the framework ensures interior roadways can accommodate vehicles, meeting fire requirements and providing clearly demarcated areas for service, parking, and pick up/drop off.
The internal roadways are designed for everyday use but built to support fire access when needed. The Park Promenade and Shared Pathways are designated as emergency access streets with the appropriate width for fire access. The approximate roadway width for emergency access streets is 40 feet.
These are shared streets with appropriate width for garbage trucks and other service vehicles. The approximate roadway width for the service streets is 30 feet.
Two shared parking garages are located on either side of 1300 South. Parking Garage South has access from Main Street and Parking Garage North has access from mid-block service street.
Main Street provides direct vehicular access for Fire Station 8.
All service entries are sited on service streets along the backside of new development.
Lobby entries are primarily sited along existing roadways like West Temple Street, 1300 South, Main Street, Richards Street, and Paxton Street. However, multi-family housing blocks have lobby entries along the shared streets and/or alleyways.
Designated pick-up/drop-off areas for events are located on West Temple, 1300 South, and Main Street.

Scroll horizontally to inspect the map.
Circled P symbols place shared parking garages in block B, north of 1300 South, and block G, south of it. Circled vehicle symbols mark pick-up/drop-off on West Temple Street, 1300 South, and Main Street. North is shown at the lower right.