The Roadmap

Phase 1

Phase 1 development and infrastructure is focused on the partial demolition of the ballpark, interim activation of streets and parking lots, and building housing.

New vertical development includes the following:

  1. The partial demolition of Smith’s Ballpark, preserving the western segment for future adaptive re-use.
  2. Construction of multi-family housing on the northern surface parking block at the corner of West Temple Street and Paxton Avenue.
  3. Construction of lower density housing along West Temple Street.

New infrastructure investment includes the following:

  1. Interim activation of West Temple as a ‘festival street’, providing opportunity for street closures for seasonal community events.
  2. Interim activation of a portion of the surface parking lot closest to 1300 South.
  3. Construction of a east-west street segment to serve lower density housing.
Inset locator plan with lettered blocks A through L and colored highlights for Phase 1.
Axonometric site plan with numbered markers showing the locations for the Phase 1 proposals, with neighboring blocks and streets in pale gray.
Phase 1 site plan
Map description

The axonometric plan uses circled numbers 1–6 to locate the proposals listed in the visible text. Phase 1 areas are emphasized with orange line patterns; the small inset plan labels site blocks A–L and highlights blocks A and L.