Lanes, Volumes, Timings

30: Far Hills Ave & East Ave

01/06/2023
EBL arrowEBT arrowEBR arrowWBL arrowWBT arrowWBR arrowNBL arrowNBT arrowNBR arrowSBL arrowSBT arrowSBR arrow
Lane GroupEBLEBTEBRWBLWBTWBRNBLNBTNBRSBLSBTSBR
Permitted Phases44826
Detector Phase444882266
Switch Phase
Minimum Initial (s)10.010.010.010.010.020.020.020.020.0
Minimum Split (s)22.522.522.533.033.026.026.026.026.0
Total Split (s)42.042.042.042.042.078.078.078.078.0
Total Split (%)35.0%35.0%35.0%35.0%35.0%65.0%65.0%65.0%65.0%
Maximum Green (s)36.036.036.036.036.072.072.072.072.0
Yellow Time (s)4.04.04.04.04.04.04.04.04.0
All-Red Time (s)2.02.02.02.02.02.02.02.02.0
Lost Time Adjust (s)0.00.00.00.00.00.00.0
Total Lost Time (s)6.06.06.06.06.06.06.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s)3.03.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneC-MaxC-MaxC-MaxC-Max
Walk Time (s)7.07.07.07.07.07.0
Flash Dont Walk (s)20.020.010.010.010.010.0
Pedestrian Calls (#/hr)220055
Act Effct Green (s)18.218.218.289.889.889.889.8
Actuated g/C Ratio0.150.150.150.750.750.750.75
v/c Ratio0.140.150.690.130.320.170.41
Control Delay42.642.663.26.65.93.03.5
Queue Delay0.00.00.00.00.00.00.0
Total Delay42.642.663.26.65.93.03.5
LOSDDEAAAA
Approach Delay42.663.26.03.5
Approach LOSDEAA
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 26 (22%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.69
Intersection Signal Delay: 9.5Intersection LOS: A
Intersection Capacity Utilization 73.2%ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 30: Far Hills Ave & East Ave
Splits diagram phase 2 and 6Splits diagram phase 2 and 6 extensionSplits diagram phase 4 and 8Splits diagram phase 4 and 8 extension