Lanes, Volumes, Timings

26: Far Hills Ave & Peach Orchard Rd/Peach Orchard Ave

01/06/2023
EBL movement arrowEBT movement arrowEBR movement arrowEBR2 movement arrowWBL2 movement arrowWBL movement arrowWBT movement arrowWBR movement arrowNBL movement arrowNBT movement arrowNBR movement arrowSBL2 movement arrow
Lane GroupEBLEBTEBREBR2WBL2WBLWBTWBRNBLNBTNBRSBL2
Permitted Phases48826
Detector Phase44888226
Switch Phase
Minimum Initial (s)10.010.010.010.010.020.020.020.0
Minimum Split (s)33.033.022.522.522.526.026.026.0
Total Split (s)38.038.038.038.038.050.050.082.0
Total Split (%)31.7%31.7%31.7%31.7%31.7%41.7%41.7%68.3%
Maximum Green (s)32.032.032.032.032.044.044.076.0
Yellow Time (s)4.04.04.04.04.04.04.04.0
All-Red Time (s)2.02.02.02.02.02.02.02.0
Lost Time Adjust (s)0.00.00.00.00.0
Total Lost Time (s)6.06.06.06.06.0
Lead/LagLeadLead
Lead-Lag Optimize?YesYes
Vehicle Extension (s)3.03.03.03.03.03.03.03.0
Recall ModeNoneNoneNoneNoneNoneC-MaxC-MaxC-Max
Walk Time (s)7.07.07.07.07.0
Flash Dont Walk (s)20.020.010.010.010.0
Pedestrian Calls (#/hr)252520200
Act Effct Green (s)20.420.455.655.687.6
Actuated g/C Ratio0.170.170.460.460.73
v/c Ratio0.390.140.020.410.02
Control Delay46.739.913.617.07.2
Queue Delay0.00.00.00.00.0
Total Delay46.739.913.617.07.2
LOSDDBBA
Approach Delay46.739.917.0
Approach LOSDDB
Intersection Summary
Area Type:Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 20 (17%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 85
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 19.2Intersection LOS: B
Intersection Capacity Utilization 57.6%ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 26: Far Hills Ave & Peach Orchard Rd/Peach Orchard Ave
Splits and phases timeline diagram
Far Hills Ave PM No Build
CMT
Synchro 11 Report
Page 19