Lanes, Volumes, Timings

21: Far Hills Ave & Park Rd/Aberdeen Ave

01/06/2023
EBL direction EBT direction EBR direction WBL direction WBT direction WBR direction NBL direction NBT direction NBR direction SBL direction SBT direction SBR direction
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Initial (s) 10.0 10.0 10.0 10.0 20.0 20.0 20.0 20.0
Minimum Split (s) 33.0 33.0 22.5 22.5 26.0 26.0 26.0 26.0
Total Split (s) 33.0 33.0 33.0 33.0 87.0 87.0 87.0 87.0
Total Split (%) 27.5% 27.5% 27.5% 27.5% 72.5% 72.5% 72.5% 72.5%
Maximum Green (s) 27.0 27.0 27.0 27.0 81.0 81.0 81.0 81.0
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None Max Max C-Max C-Max C-Max C-Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 20.0 20.0 10.0 10.0 10.0 10.0
Pedestrian Calls (#/hr) 12 12 0 0 13 13
Act Effct Green (s) 27.0 27.0 81.0 81.0
Actuated g/C Ratio 0.22 0.22 0.68 0.68
v/c Ratio 0.09 0.05 0.37 0.61
Control Delay 37.8 37.0 3.5 7.8
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 37.8 37.0 3.5 7.8
LOS D D A A
Approach Delay 37.8 37.0 3.5 7.8
Approach LOS D D A A
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 120
Offset: 58 (48%), Referenced to phase 2:NBTL and 6:SBTL, Start of Yellow
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.61
Intersection Signal Delay: 6.9 Intersection LOS: A
Intersection Capacity Utilization 55.8% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 21: Far Hills Ave & Park Rd/Aberdeen Ave
Splits and Phases diagram part 1 Splits and Phases diagram part 2 Splits and Phases diagram part 3 Splits and Phases diagram part 4