This four-leg intersection is analyzed assuming 2 lanes on the major street approach and 1 through lane on the minor street approach, resulting in the following:
Warrant #1. Only four hours of traffic data were collected at this intersection since it was expected to meet Warrants #2 and #3 at a minimum. Warrant #1 is n/a.
Warrant #2. Plotting the four highest volume-pairs as described in the methodology section on top of OMUTCD Figure 4C-1 (Figure 6A) resulted in all four volume pairs exceeding warrant #2 threshold. Warrant #2 is satisfied.
Warrant #3. Plotting the highest volume-pair as described in the methodology section on top of OMUTCD Figure 4C-3 (Figure 6B) resulted in the volume pair exceeding warrant #3 threshold. Warrant #3 is satisfied.