Signal Warrant SR 48 and Peach Orchard
STUDY AND ANALYSIS INFORMATION
Municipality: City of Oakwood
County: Montgomery
ODOT Engineering District: 7
Google map link: Map
Traffic Volumes Obtained By: Crawford, Murphy & Tilly
Analysis Date: 10/6/2022
Agency/ Company Name Performing Warrant Analysis: Crawford, Murphy & Tilly
Analysis Information
Data Collection Date: 9/14/2022
Day of the Week: Wednesday
Is the intersection in a built-up area of an isolated community of <10,000 population? Yes
Existing Traffic Signal at intersection: Yes
Total Number of Approaches at Intersection: 5
Major Street Information
Major Street Name and Route Number: SR 48
Major Street Approach Direction:
N-Bound S-Bound
Number of Thru Lanes on Each Major Street Approach: 2 LANE(S)
Speed Limit or 85th Percentile Speed on the Major Street*: 35 MPH
*Unknown assumes below 45 mph
Minor Street Information
Minor Street Name and Route Number: Peach Orchard
Minor Street Approach Configuration:
1 E-Bound
1 W-Bound
1 2 3 4 5
Number of Thru Lanes on Each Minor Street Approach: 1 LANE(S)
Apply Right Turn Lane Reduction*: No
*Right Turn Lane Reduction Shall be used for Warrants 1, 2, & 3 for New ODOT Signals. Please refer to TEM 402-3.2 for clarification and criteria under which Right Turn Reduction is not required.
Published Jan. 2022
Input & Findings
Page 1