Lane Group NBL NBT NBR NBR2 SBL SBT SBR SEL2 SEL SET SER SER2
Permitted Phases 6 6
Detector Phase 10 10 12 12 6 6 6
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 10.0 20.0 20.0 20.0
Minimum Split (s) 33.0 33.0 22.5 22.5 26.0 26.0 26.0
Total Split (s) 33.0 33.0 22.5 22.5 61.5 61.5 61.5
Total Split (%) 22.0% 22.0% 15.0% 15.0% 41.0% 41.0% 41.0%
Maximum Green (s) 27.0 27.0 16.5 16.5 55.5 55.5 55.5
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 2.0 2.0 2.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None Max Max Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0
Flash Dont Walk (s) 20.0 20.0 10.0 10.0 10.0
Pedestrian Calls (#/hr) 5 5 18 18 18
Act Effct Green (s) 16.5 13.8 13.8 75.3
Actuated g/C Ratio 0.11 0.09 0.09 0.50
v/c Ratio 0.60 0.65 0.64 0.25
Control Delay 75.1 84.9 84.5 19.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 75.1 84.9 84.5 19.6
LOS E F F B
Approach Delay 75.1 84.7 19.6
Approach LOS E F B
Intersection Summary
Area Type: Other
Cycle Length: 150
Actuated Cycle Length: 150
Offset: 58 (39%), Referenced to phase 2:NWTL, Start of Yellow
Natural Cycle: 135
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.69
Intersection Signal Delay: 32.7 Intersection LOS: C
Intersection Capacity Utilization 67.9% ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 3: W Thruston Blvd/E Thruston Blvd & Oakwood Ave & Far Hills Ave
Splits phase 2 and 6 diagram Splits phase 4 and 8 diagram Splits phase 10 diagram Splits phase 12 diagram