Signal Warrant Shafor and Telford
Municipality:
City of Oakwood
Traffic Volumes Obtained By:
Crawford, Murphy & Tilly
County:
Montgomery
Analysis Date:
10/11/2022
ODOT Engineering District:
7
Agency/ Company Name Performing Warrant Analysis:
Crawford, Murphy & Tilly
Google map link:
Analysis Information
Data Collection Date: 9/27/2022
Day of the Week: Tuesday
Is the intersection in a built-up area of an isolated community of <10,000 population? Yes
Existing Traffic Signal at intersection: Yes
Total Number of Approaches at Intersection: 4
Major Street Information
Major Street Name and Route Number: Shafor
Major Street Approach Direction:
N-Bound S-Bound
Number of Thru Lanes on Each Major Street Approach: 1 LANE(S)
Speed Limit or 85th Percentile Speed on the Major Street*: 25 MPH
*Unknown assumes below 45 mph
Minor Street Information
Minor Street Name and Route Number: Telford
Minor Street Approach Configuration:
1 E-Bound 1 W-Bound
1 2 3 4 5
Number of Thru Lanes on Each Minor Street Approach: 1 LANE(S)
Apply Right Turn Lane Reduction*: No
Published Jan. 2022
Input & Findings
Page 1